Close Menu
    What's Hot

    STS Digital Awarded Best Derivatives Trading Solution at TradingTech Insight Awards

    June 12, 2026

    KSQF UNICEF project helps children leave Congo mines

    June 11, 2026

    UAE and US discuss UN cooperation in Abu Dhabi

    June 11, 2026
    Facebook X (Twitter) Instagram
    fareastdaily.comfareastdaily.com
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    fareastdaily.comfareastdaily.com
    Home » ADNOC Drilling awarded $2 billion for the Hail, Ghasha Development Project
    Business

    ADNOC Drilling awarded $2 billion for the Hail, Ghasha Development Project

    July 27, 2022
    Facebook Twitter Pinterest Reddit Telegram LinkedIn Tumblr VKontakte WhatsApp Email

    In connection with the Hail and Ghasha Development Project, Abu Dhabi National Oil Company (ADNOC) announced the award of two large contracts totaling $2 billion (AED7.49 billion) to ADNOC Drilling. A total of $1.3 billion (AED4.89 billion) will be spent on integrated drilling services and fluids, and $711 million (AED2.6 billion) will be spent on providing four Island Drilling Units. ADNOC Logistics & Services was also awarded a third contract for offshore logistics and marine support services valued at $681 million (AED2.5 billion).

    ADNOC Drilling awarded $2 billion for the Hail, Ghasha Development ProjectIn total, more than 80% of the awards will flow back into the UAE’s economy as part of ADNOC’s successful In-Country Value (ICV) program. Each of the three contracts covers the Hail and Ghasha drilling campaign for a maximum of ten years. This project is part of the Ghasha Concession, which is the world’s largest offshore sour gas development and an important component of ADNOC’s integrated gas masterplan as well as an important enabler of UAE gas self-sufficiency.

    With the expansion of ADNOC’s liquified natural gas (LNG) capacity, ADNOC’s gas masterplan ensures a sustainable and economical supply of natural gas to meet the growing demands of the UAE and international markets. As part of the plan, new approaches and technologies will be applied to increase and improve gas recovery from existing fields, as well as develop untapped resources and leverage innovation to reduce emissions over time.

    Natural gas production from the Ghasha Concession is expected to begin around 2025, ramping up to over 1.5 billion standard cubic feet per day (SCFD) by the end of the decade. A total of four artificial islands have already been completed, and development drilling is underway. As part of the Ghasha Concession, ADNOC and its partners awarded two Engineering, Procurement & Construction (EPC) contracts last November. For the Hail and Ghasha project, they also awarded a contract for updating Front-End Engineering and Design (FEED). By the end of the year, the updated design will further optimize costs and timing, as well as potentially accelerate carbon capture integration.

    Share. Facebook Twitter Pinterest LinkedIn Reddit Email

    Related Posts

    Samsung leads global chip investment with US$59.2B spend

    June 10, 2026

    Korean cosmetics exports hit US$5.6 billion in five months

    June 8, 2026

    Egypt GDP rises 5.2% as foreign reserves climb

    June 8, 2026

    Dollar heads for weekly gain as yen nears 160 level

    June 5, 2026
    Latest News

    KSQF UNICEF project helps children leave Congo mines

    June 11, 2026

    UAE and US discuss UN cooperation in Abu Dhabi

    June 11, 2026

    Kuwait flights resume after brief airspace closure

    June 11, 2026

    Samsung leads global chip investment with US$59.2B spend

    June 10, 2026

    DR Congo Ebola cases rise to 598 as deaths reach 115

    June 10, 2026
    © 2026 Fareast Daily | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.