Close Menu
    What's Hot

    Modi launches Pune Metro projects worth ₹21,800 crore

    November 4, 2026

    MEAPMP Launches: Revamped Independent Ad-Tech & Premium Media Buying Across MEA

    November 3, 2026

    Abu Dhabi signs four OpenAI deals as Sheikh Khaled meets Altman

    November 3, 2026
    Facebook X (Twitter) Instagram
    Fareast DailyFareast Daily
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Fareast DailyFareast Daily
    Home » First Phase of JA Solar Baotou Manufacturing Base 50MW Rooftop PV Project Starts Construction
    PR Newswire

    First Phase of JA Solar Baotou Manufacturing Base 50MW Rooftop PV Project Starts Construction

    October 20, 2023
    Facebook Twitter Pinterest Reddit Telegram LinkedIn Tumblr VKontakte WhatsApp Email

    BEIJING, Oct. 20, 2023 /PRNewswire/ — JA Solar recently announced that the first phase of its Baotou Manufacturing Base 50MW Rooftop Distributed Photovoltaic (PV) Project has started construction. The project is believed to be an important step in promoting company-wide green production and operations.

    First Phase of JA Solar Baotou Manufacturing Base 50MW Rooftop PV Project Starts Construction

    With an investment of RMB150 million, the project will be constructed in four phases, and it is expected to be completed by the end of 2023. Installed with JA Solar n-type DeepBlue 4.0 modules, the project is expected to generate 65 million kWh of electricity per year, equivalent to a yearly carbon emission reduction of 54,000 tons. It has been commented by local media that the project will become a model in promoting the application of solar PV in the local area.

    JA Solar always adheres to the concept of sustainable development. JA Solar practices the concept of low-carbon development in its operations, and has built up a green manufacturing ecosystem. As of February 2023, six of JA Solar’s manufacturing bases have been listed in the Ministry of Industry and Information Technology (MIIT)’s “green factories” list. Earlier this year, the n-type products of JA Solar were awarded the carbon footprint PPE2 certification by the French authority Certisolis, which indicates that JA Solar is among the first batch of PV module manufacturers to obtain the French carbon footprint certification under the new PPE2 standard, and demonstrates the low-carbon competitiveness of JA Solar’s n-type products.

    Photo – https://mma.prnewswire.com/media/2252851/image_1.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/first-phase-of-ja-solar-baotou-manufacturing-base-50mw-rooftop-pv-project-starts-construction-301963021.html

    Share. Facebook Twitter Pinterest LinkedIn Reddit Email

    Related Posts

    Binance Introduces Agent OS to Connect AI Applications to Financial Infrastructure

    September 2, 2026

    Binance TradFi Perpetuals Gain Greater Traction as Multi-Asset Strategy Takes Hold

    August 27, 2026

    Binance Research: Tokenized RWAs Grow 50% to US$34B in H1 2026 as Broader On-Chain Markets Contract

    August 25, 2026

    Binance Launches U.S. Stocks Trading and Previews bStocks Tokenized Securities

    July 15, 2026
    Latest News

    Modi launches Pune Metro projects worth ₹21,800 crore

    November 4, 2026

    MEAPMP Launches: Revamped Independent Ad-Tech & Premium Media Buying Across MEA

    November 3, 2026

    Abu Dhabi signs four OpenAI deals as Sheikh Khaled meets Altman

    November 3, 2026

    Indonesia posts $10.6 billion trade surplus on non-oil exports

    November 3, 2026

    Africa’s top banks build war chest for Kenya takeover deals

    November 3, 2026
    © 2026 Fareast Daily | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.